Staircase Landings Every staircase should have a landing at the top and bottom. The width of the landing, measured perpendicular to the direction of travel, must be no less than the width of the staircase. The minimum depth, measured in the direction of travel, is 36 inches.

How big does a landing have to be UK?

Where an optional access standard is required for a home built in England to create a category 2 accessible and adaptable dwelling, the minimum landing width for circulation purposes is 900mm and the minimum length of landing is 850mm due to the minimum stair width recommendation for this type of property.

What is the minimum width of the landing area?

A width of a stair landing cannot be less than the width of the stair itself, and the length (in direction of travel) cannot be less than 36 inches, according to the Internation Residential Code (IRC 311.7.

What is the minimum size of a stair landing?

The width of landings shall not be less than the width of stairways they serve. Every landing shall have a minimum dimension measured in the direction of travel equal to the width of the stairway. Such dimension need not exceed 48 inches (1219 mm) where the stairway has a straight run.

How big should a deck landing be?

3 feet by 3 feet

The minimum size for a landing is 3 feet by 3 feet or the width of the stair sections meeting at the landing—whichever is greater. As shown in the illustration below, the minimum depth is measured from the nosing of the stair, not the riser.

Can you open a door onto a landing?

Landings should be clear of permanent obstructions. They may have doors to cupboards or ducts that open over them, but these should remain closed in normal use. Other doors may swing across landings in dwellings, but only as shown below. A headroom of at least 2m should be provided on all landings.

How many stairs before a landing is required?

ADA Stair Landings



– A landing is required every 12′ of vertical stairway rise.

What are the steps to building a landing?

Piece. If you have help it'll be easier to build it in one piece on the floor. And then nail it in. Place. This 2×4 is it's a temporary leg to hold up the joists while I nail it.

Do outdoor stairs need a landing?

Outdoor stair landing code



Outdoor landings must comply with the requirements of section R311. 7.6 Landings for stairways. There shall be a floor or landing at the top and bottom of each stairway and the width perpendicular to the direction of travel shall not be less than the flight served.

Is a landing required at the bottom of deck stairs?

Do Deck Stairs Need a Landing? All exterior staircases are required by code to have landings at the bottom and top to make sure it is safe and there is plenty of room for doors to swing, and for people to use.

How do you build an outdoor staircase landing?

For outside mount stringers remove the thickness of the riser. Board off the back of the stringer. Both situations remove the thickness of the tread from the bottom of the stringer.

How long can deck stairs be without a landing?

A solid landing, at least as wide as the stairs and at least 36 inches deep in the direction of travel, should be located at the top and bottom of each flight of stairs. A flight of stairs should not rise vertically more than 147 inches without a landing.

How thick should a concrete stair landing be?

Concrete is typically applied at a minimum of two inches, but I recommend a minimum thickness of 4 inches for a durable stair footing.

How do you make a concrete landing for stairs?

Before i mix the concrete up i took a metal grid. And cut it to the size of the form i've seen people use chicken wire for this. And this stuff is a little more rigid it is not as thick as rebar.

How do you pour a concrete landing pad?

Pour Concrete



Mix the concrete and pour it into the forms. Using a board long enough to reach from form to form, screed the surface: Drag the board, using a side-to-side motion as you move it across the length of the pad. Repeat until the surface is level and has no low spots.

How do you finish a concrete landing?

Here are the steps for finishing a concrete slab:

  1. Spread the concrete. Use a square shovel or a come-along tool to push and pull the wet concrete into place.
  2. Screed the concrete. …
  3. Float the surface. …
  4. Edge the slab. …
  5. Groove in joints. …
  6. Trowel the surface.


How soon after pouring concrete should you water it?

To put it simply, the goal is to keep the concrete saturated during the first 28 days. The first 7 days after installation you should spray the slab with water 5-10 times per day, or as often as possible. Once the concrete is poured the curing process begins immediately.

How long after pouring concrete can you float it?

Allow all of the water to disappear before you do anything else. This can take 20 minutes or 4 hours depending on the temperature, humidity and how hard the wind is blowing. After the bleed water is all gone you can get out your steel finishing trowel and put on the final touches.

How long do you let concrete set before removing forms?

The forms or “molding” that holds the concrete in place until it dries should be left alone for at least two days to ensure that the concrete is completely dry. If the forms are removed too soon, the concrete can begin to sag, crack and collapse, especially if conditions like temperature affected its strength.

Is it OK if it rains after pouring concrete?

Light sprinkles of rain can cause no damage to freshly prepared concrete structures. However, heavy rain showers and thunderstorms cause the surface to become soft and flaky. In such situations, use a plastic sheet for covering the surface or structure.

Can you leave concrete forms on too long?

In short, there is no such thing as leaving concrete forms on for too long, as they will simply continue the curing process as the forms remain in place. However, there is no real need to leave forms on for longer than necessary.

How long does 4 inches of concrete take to cure?

While it only takes around 28 days to cure concrete, drying can take months. The general rule of thumb is that concrete takes about 30 days to dry for every one inch of slab thickness.

What happens if you dont water concrete?

Concrete that is not moist-cured at all dries too rapidly, and reaches less than half its potential design strength. It will also have a greater number of shrinkage cracks.

Can I pour concrete over 2 days?

Although concrete will harden soon after pouring, it’s still susceptible to damage from weight during the first four weeks. Wait at least 24 hours before allowing foot traffic, including pets, on a newly poured sidewalk or slab, and don’t drive a vehicle on a new driveway for at least 10 days.