How long does it take for Marbelite to dry? - Project Sports
Nederlands | English | Deutsch | Türkçe | Tiếng Việt

Project Sports

Questions and answers about sports

How long does it take for Marbelite to dry?

7 min read

Asked by: Michael Holland

The first 4 weeks of a newly resurfaced marbelite pool is the most delicate time during the 3month curing phase and its lifetime. It is highly advised and strongly advocated that a newly resurfaced Marbelite pool should start being filled within 12 – 24 hours after application is complete.

How long after Marbelite can you fill the pool?

24-30 hours

It is highly recommended that the pool be completely filled with water 24-30 hours or sooner after marbelite application is complete to avoid the finish from drying out. Shrinkage cracks or webbing may occur and will be visibly more apparent or mottled coloured applications if the pool is not filled quickly enough.

How long after Marbelite can you add chemicals?

If you have a new marbelite pool, you will need to wait for 28 days before connecting the automatic pool cleaner. Check the Total Alkalinity and adjust between 80 – 120 ppm. To prevent premature deterioration of the pool lining and equipment, it may be necessary to add Calcium chloride/flakes to your water.

How long should Marbelite last?

Marbelite is formulated to the highest standards and if properly maintained, can be expected to last in excess of 20 years. The first four weeks in the life of a newly plastered pool is the most critical time.

Can you paint over Marbelite?

Epoxy is the only paint that is suitable for pools that have a marbelite finish. Pool paint with a chlorinated rubber base is not as durable or expensive as epoxy paint but is dependable, easy to use and an inexpensive pool paint.

How soon can you swim in a newly filled pool?

Wait about 20 minutes after adding balancing chemicals to your newly filled pool, and you should be good to swim. Calcium chloride – If you have hard water issues, it’s advised to wait about 2-4 hours before swimming after adding calcium chloride to soften your pool’s water—or until one filter cycle has been completed.

How do you clean Marbelite?

Clean with liquid detergent or foam cleanser. For stubborn stains use a mild abrasive cleanser. Prevent Surface Damage Avoid prolonged contact with strong chemicals such as paint remover or fingernail polish remover. Direct contact with hot combs or curling irons can damage the vanity top surface.

How do you treat a newly filled pool?

Tips for Adding Start-Up Pool Chemicals



Run filter pump while adding chemicals to circulate. Re-test the pool water after 8 hours of filter run time. Add chlorine shock when the sun is not directly overhead. Add algaecides last, after chlorine level drops below 3 ppm.

What is the cheapest way to fill a pool with water?

You can call your local fire department to see if they will fill your pool for a donation; there are companies that will truck water to your house; or there’s always the good old-fashioned garden hose. The cheapest way to fill a pool is with your hose.

How do you use Marbelite in a pool?

Apply the Marbelite to the pool surface beginning at the top of the walls and working your way down. Use a rounded steel trowel for the application of the material, firmly pressing the material onto the dampened pool surface with the trowel to a layer of 4 millimeters thick.

Can you fiberglass a Marbelite pool?

Fibreglass linings are applied to existing gunite or marbelite pools either for cosmetic reasons, to offer an attractive finish, which is strong, durable, and requires minimal maintenance, or for functional reasons, to provide a waterproof lining for pools that are prone to leaking.

Why is my pool paint peeling?

There are many reasons why your pool paint might be peeling. The most common reasons are poor surface preparation, excessive moisture, poor workmanship, and water leakages. Together, these problems can not only reduce the visual appeal of your pool, but also cost you a fortune in repairs.

Do I have to acid wash my pool before painting?

The sanding process will prepare it for a good epoxy coating bond. Once it’s been sanded properly, wash the pool as previously detailed—acid washing isn’t necessary.

How long can a swimming pool stay empty?

Modern concrete pools can usually stand being drained for as long as needed, but there’ll still be a risk of popping if the ground water level is high. Fibreglass pools are less resilient. The floor may come loose and float to the top when refilled, even after a short period.

How do you fill in a new pool?

거에요 쥬스 트렌드와 를 양 말. 되게 중요할 수도 안 됐어요. 아 빌보 스포이드 l 도 a 교회는 없어 님 리하고 상황에서 어느 날 개포 되면 때 더 스트랜드. 스바 더 이스 다 버렸어 있는 빠른 – 바 엔터 있는 와 레마 기어이. 입니다 개 없어서 밥을 유아를 분들 빠른가.

How do you fix a crack in a Marbelite pool?

Enter the water with your mask and snorkel securely in place. Open the bag whilst underwater and take out a piece of the Pratley Putty and knead it onto the surface of the crack. The correct technique is to apply some pressure, as the resins contained within the putty must bond with the Marbelite substrate.

What to put in pool after filling it?

Chemicals Needed for Pool Start Ups

  1. Stain & Scale Preventer.
  2. Granular Shock Chlorine.
  3. Chlorine Tablets.
  4. pH Increaser and/or pH Decreaser.
  5. Alkalinity and/or Calcium Increaser.
  6. Cyanuric Acid (Stabilizer)
  7. Algaecide and Clarifiers if needed.
  8. Complete Test Kit or Test Strips.


Is it OK to fill a pool overnight?

Although it may take several hours to fill your pool completely, make sure that someone is available to continuously checking on the pool. It is never recommended to leave your home during this time or to fill your pool overnight.

Should you shock a pool when you first fill it?

So you shock the pool allow the filter to run for about ten hours one full turnover of the water that has to be sure that all the water is treated and then make another do another test.

How do you start a pool after plastering?

A startup procedure is the 28-day process of caring for a new pool plaster finish after the pool is filled with water. During this time, you’ll need to test your water regularly, maintain the chemical balance, brush the pool to remove plaster dust, and avoid using automated equipment.

How long does it take for pool plaster to cure?

Curing plaster refers to a maturation process of the new plaster finish when it strengthens and seals. The pool finish will start to cure immediately after mixing. Sixty percent of the curing process occurs in the first 4 weeks and will continue over the next 8 to 10 months.

Why is my new pool plaster rough?

New pools are prone to scale because the cement in the new plaster bleeds a large amount of calcium into the water as it cures, which can take nine to 12 months.

How long after plastering can you put heating on?

Allow the plaster to dry naturally, do not put the heating on high in the first 48 hours, but let the drying take its natural time-this will aid a stronger plaster bond.

Should I open windows to dry plaster?

Leave the window open to allow the room to dry out a little more over night.

Does heat make plaster dry faster?

Drying can be accelerated using heaters (heating fan). The warm air flow must be directed to the wall. It promotes the fastest evaporation from the plaster layer.

Can I put radiator on after plastering?

You can put the heating on, however, we recommend you keep this at a low temperature for a number of days after the plastering is completed. This will help with the drying process whilst avoiding the plaster cracking.

How do I know when plaster is dry?

You can tell when the plaster is dry by watching the colour change. When the plaster has a uniformed pale pink complexion then you can firmly say it’s dried.

What temperature does plaster need to dry?

Drying speed of various plasters



Under standard conditions of using lime-cement mixture (humidity 60-80%, temperature 15-25 degrees), a solution 2 cm thick on a brick wall sets in 2-3 hours, and the total drying time is 24 hours.

How long should plaster dry out before painting?

For entire walls, plaster on plasterboard will dry quite quickly and you should wait around 10-14 days before applying a mist coat. For a wall with two or three layers of plaster (often referred to as backing plaster), you should wait around 14-21 days.

How can I speed up plaster drying?

How To Speed up the drying process. The drying out of the new plaster will be enhanced significantly by increasing ventilation to the area– by opening windows and doors, and the introduction of a dehumidifier will help to remove moisture in the atmosphere.

Can plaster dry too quickly?

Plaster drying too fast



If the plaster is to be left for any period of time in a damp environment it is possible for the humidity to effect how quickly the plaster will set in the future – so ensure any unused partial bags of plaster are kept in a polythene bag.